Behavioral Health – ÂÜÀòÊÓÆµ Thu, 03 Jul 2025 17:16:34 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 /wp-content/uploads/2022/03/favicon.svg Behavioral Health – ÂÜÀòÊÓÆµ 32 32 Vermilion Behavioral Health Systems /portfolio/vermilion-behavioral-health-systems/ Thu, 03 Jul 2025 17:00:38 +0000 /?post_type=portfolio&p=3269 Renovation of 36 patient rooms, spanned over 18 phase construction schedule.

The post Vermilion Behavioral Health Systems appeared first on ÂÜÀòÊÓÆµ.

]]>
The renovation covered 1,685 sq.ft. and involved enhancing finishes in 36 patient rooms, along with installing new finishes and fixtures in patient bathrooms. DD managed an 18-phase schedule, turning over two bedrooms every 5 days. The project adhered to Level 4 ICRA requirements and was executed while the hospital remained fully operational.

The post Vermilion Behavioral Health Systems appeared first on ÂÜÀòÊÓÆµ.

]]>
HCA Osceola Regional Medical Center Behavioral Health Unit /portfolio/hca-osceola-regional-medical-center-behavioral-health-unit/ Wed, 02 Jul 2025 19:48:38 +0000 /?post_type=portfolio&p=4361 Coordinated Construction for Critical Healthcare Upgrades.

The post HCA Osceola Regional Medical Center Behavioral Health Unit appeared first on ÂÜÀòÊÓÆµ.

]]>
16,000 sq.ft. interior renovation that converted the existing behavioral health unit along with the existing emergency department into a new state of the art behavioral health unit. This project consisted of Level 4 ICRA requirements, under slab and plumbing changes that had to be coordinated with the facility on a daily basis. Construction was completed 3 weeks early and one AHCA cycle ahead of schedule.

The post HCA Osceola Regional Medical Center Behavioral Health Unit appeared first on ÂÜÀòÊÓÆµ.

]]>
Palm Point Behavioral Health Hospital /portfolio/palm-point-behavioral-health-hospital-2/ Wed, 25 Jun 2025 14:54:04 +0000 /?post_type=portfolio&p=4397 Expansion-Ready Facility Delivered at Record Speed.

The post Palm Point Behavioral Health Hospital appeared first on ÂÜÀòÊÓÆµ.

]]>
The Palm Point Behavioral Health project utilized the same design as a previous project, the Coral Coast Behavioral Health facility, allowing the team to secure permits and begin earthwork within 40 days of initial contact from the owner. Construction commenced within 75 days, enabling UHS to avoid filing for a CON extension. The facility was designed and constructed to accommodate a future 40-bed vertical expansion without impacting existing patient rooms or amenities.

The post Palm Point Behavioral Health Hospital appeared first on ÂÜÀòÊÓÆµ.

]]>
JFK Medical Center 5th Floor Tower Expansion /portfolio/jfk-medical-center-5th-floor-tower-expansion/ Wed, 25 Jun 2025 14:49:14 +0000 /?post_type=portfolio&p=4391 Vertical Expansion Adding Beds and Elevating Care.

The post JFK Medical Center 5th Floor Tower Expansion appeared first on ÂÜÀòÊÓÆµ.

]]>
5th floor vertical tower expansion along with a 15-bed behavioral health addition. Adding an additional floor over the existing four floors. This project also includes raising the elevators and adding stairs up to a 6th floor mechanical penthouse.

The post JFK Medical Center 5th Floor Tower Expansion appeared first on ÂÜÀòÊÓÆµ.

]]>
UHS Lakeside Behavioral Health /portfolio/uhs-lakeside-behavioral-health/ Wed, 25 Jun 2025 14:38:56 +0000 /?post_type=portfolio&p=4385 Ground-Up Construction Supporting Mental Health Innovation.

The post UHS Lakeside Behavioral Health appeared first on ÂÜÀòÊÓÆµ.

]]>
Ground up, 28,500 sq. ft. 48-bed addition to existing behavioral health facility. Project features include an Electroconvulsive Therapy (ECT) exam suite and a Transcranial Magnetic Stimulation (TMS) exam/procedure suite.

The post UHS Lakeside Behavioral Health appeared first on ÂÜÀòÊÓÆµ.

]]>
Acadia RiverWoods – 16 Bed Addition /portfolio/acadia-riverwoods-16-bed-addition/ Wed, 25 Jun 2025 14:16:11 +0000 /?post_type=portfolio&p=4381 16-Bed Addition and CEP Built in Active Facility.

The post Acadia RiverWoods – 16 Bed Addition appeared first on ÂÜÀòÊÓÆµ.

]]>
25,000 sq.ft. 16-bed behavioral health addition. This project also included a brand new Central Energy Plant (CEP), which replaced the existing and outdated CEP, a PHP horizontal addition and an interior renovation along with a corridor and anti-ligature division 10 upgrades throughout the center. Special consideration was given to our ICRA tool management including phasing and coordination of underground plumbing and above ceiling MEP modifications on all projects due to existing patients and support staff. This project occurred while the center remained fully operational.

The post Acadia RiverWoods – 16 Bed Addition appeared first on ÂÜÀòÊÓÆµ.

]]>
UHS The Bridgeway 20-Bed Addition /portfolio/uhs-the-bridgeway-20-bed-addition/ Wed, 25 Jun 2025 11:54:56 +0000 /?post_type=portfolio&p=4374 Constructed with Care While Operations Continued.

The post UHS The Bridgeway 20-Bed Addition appeared first on ÂÜÀòÊÓÆµ.

]]>
12,500 sq.ft. 20-bed behavioral health addition to existing facility. The addition also included administrative space, site work and exterior retention areas. DD was able to re-use some of the existing structural components to save time and money. This project occurred while the center remained fully operational.

The post UHS The Bridgeway 20-Bed Addition appeared first on ÂÜÀòÊÓÆµ.

]]>
Acadia San Juan Capestrano 40 Bed /portfolio/acadia-san-juan-capestrano-40-bed/ Tue, 24 Jun 2025 19:56:55 +0000 /?post_type=portfolio&p=4367 Healthcare Growth with New Clinical and Admin Areas.

The post Acadia San Juan Capestrano 40 Bed appeared first on ÂÜÀòÊÓÆµ.

]]>
25,000 sq. ft. ground-up 40-bed addition, along with a 5,000 sq. ft. interior renovation for new medical records and administration area, and a 3,000 sq. ft. renovation to the existing standalone La Casita for further administrative office space.

The post Acadia San Juan Capestrano 40 Bed appeared first on ÂÜÀòÊÓÆµ.

]]>
HCA Largo Medical Center – 2nd Floor Behavioral Health Unit /portfolio/hca-largo-medical-center-2nd-floor-behavioral-health-unit/ Tue, 24 Jun 2025 19:44:44 +0000 /?post_type=portfolio&p=4356 Enhancing Patient Care Spaces Amid Ongoing Services.

The post HCA Largo Medical Center – 2nd Floor Behavioral Health Unit appeared first on ÂÜÀòÊÓÆµ.

]]>
This project included the complete renovation of the existing 2nd floor behavioral health unit, along with renovations within the existing 1st floor ED that were designated for psychiatric intake. The scope of work for the behavioral health unit included new MEP systems, partitions, ceilings and finishes. The scope of work for the ED included minor demolition, minor MEP revisions, hard ceiling installations within the psychiatric intake rooms and finish upgrades within the entire space. This project occurred while the medical center remained fully operational.

The post HCA Largo Medical Center – 2nd Floor Behavioral Health Unit appeared first on ÂÜÀòÊÓÆµ.

]]>
North Spring Behavioral Healthcare /portfolio/north-spring-behavioral-healthcare/ Tue, 24 Jun 2025 19:37:48 +0000 /?post_type=portfolio&p=4351 Building New Spaces Without Disrupting Treatment.

The post North Spring Behavioral Healthcare appeared first on ÂÜÀòÊÓÆµ.

]]>
The North Spring Behavioral Healthcare project featured an 8,500 sq. ft. expansion on the existing hospital. The center remained fully open and operation while our team worked to expand the facilities to include space for 15 new patient beds, additional staff support spaces, and treatment rooms.

The post North Spring Behavioral Healthcare appeared first on ÂÜÀòÊÓÆµ.

]]>